Maximize the lifespan of your property's flat roof.

Need Emergency Service? Call (905) 397-1198

Cutting $16,000 in Costs by Reusing Insulation

Cutting $16,000 in Costs by Reusing Insulation

Retail Plaza

42,300 sq ft

5 Days to Complete

Burlington, Ontario

Need help with your roof?

The membrane on this Burlington retail plaza had reached end of life. It was leaking, and ponding water had become a recurring problem due to poor drainage. Since the building was tenant-occupied, every delay and disruption carried real consequences for the property manager.

When we pulled back the failed membrane during the initial assessment, the insulation underneath told a different story. It was dry, uncontaminated, and structurally sound — still delivering its original R-value.

Instead of a full tear-off with new insulation, disposal fees, and the extra labour that comes with it, the project became a candidate for insulation reuse — a faster, more cost-effective path to a brand new roof system.

We ran a selective tear-off, stripping the failed membrane while keeping the sound insulation in place. Tapered insulation was added where drainage needed correction, then we finished with a two-ply modified bitumen system and a protective gravel surface.

Free Roof Assessment for Major Canadian Grocer in Burlington, Ontario

Assessment & Insulation Check

We walked the entire roof, checking for moisture, contamination, and heat loss to confirm the existing insulation could stay in place to help save the owner thousands in removal and disposal.

Crew setting up materials for old roof membrane while protecting existing insulation beneath

Selective Tear-Off

The failed membrane was stripped while the crew protected the sound insulation underneath. Damaged spots were cut out and replaced individually rather than scrapping the entire layer.

Installation of two-ply base and cap sheets installed over existing insulation in Burlington, Ontario

Base & Cap Sheet Installation

New base and cap sheets were installed over the existing insulation, with tapered insulation added where needed to correct drainage and move water toward the drains.

Finishing the flat roof with gravel surface and detailed edging after insulation reuse project

Gravel Surface & Final Inspection

A protective gravel layer went down as the final weatherproofing surface, followed by detailed edge sealing, a full inspection, and a clean site handoff with zero disruption to tenants below.

Many roofing contractors default to a full tear-off because it’s simpler to quote — even when the insulation underneath is perfectly good.

We assessed this roof honestly and found insulation worth keeping. The project came in at roughly two-thirds the cost of a conventional flat roof replacement, the building stayed operational throughout, and the owner now has a new roof system with proper drainage.

Learn more about reusing insulation

Your Rooftop Is Your Most Expensive Asset to Ignore. We Ensure You Maximize Roof Life.

90-Minute Response Guarantee

Our offices are just a short drive to Burlington. When you have an emergency, we’ll be on-site within 90 minutes or the service call is free.

Contact Us Today

$5 Million Liability Insurance

Every project is backed by full liability coverage. Your property, your tenants, and your investment are protected from day one through project completion.

Why Roofing Insurance Matters
maple leaf from the flag of Canada

28+ Years on Ontario Rooftops

Videl Roofing has been repairing, replacing, and maintaining commercial flat roofs across Southern Ontario since 1998.

Meet Your Roofing Contractors

Maximizing Roof Life Across Ontario

Replacing Leaky Flat Roof for Industrial Property in Elmira