FOR SANYO CANADIAN MACHINE WORKS INC.
7-Day Flat Roof Replacement in Elmira
Got an Aging Roof that Needs Replacing Soon?
PROJECT OVERVIEW
20,000 sq. ft. Roof Replacement for Sanyo in Elmira, Ontario
The existing 20,000 sq. ft. roof at Sanyo Canadian Machine Works in Elmira had reached the end of its service life. Like many older flat roofs, it had become increasingly difficult to maintain, with leaks forming and energy loss through worn-out insulation.
Our objective was to replace the outdated system with a new, durable roof that would improve insulation, protect the building envelope, and help reduce long-term repair costs for the owner.
The Challenges
Project Location:
FREE
ROOF ASSESSMENT
Get a free, no-obligation roof assessment from a Videl Roofing expert.
VIDEL’s FAST RE-ROOFING PROCESS
How We Got It Done in Just 7 Days
Step 3: Poly Iso Installation
Next, we installed new polyisocyanurate (ISO) insulation. At Videl Roofing, we use a high-performance insulation is key to the roof’s long-term energy efficiency, creating a strong thermal barrier that reduces heat loss in winter and heat gain in summer.
Step 4: BASE Sheet Installation
With the new insulation in place, we installed the base sheet. This layer provides the foundation for the new BUR system, ensuring a uniform surface and acting as a critical component of the roof’s waterproofing.